TECHNICAL

You can find detailed information about our products from the files below.

Placco slabs and cladding products should only be installed using methods and equipment specified by suitably qualified and experienced craftsmen. Cleaning and maintenance of the tiled products should be done in accordance with the recommended instructions.

kayastone products have unlimited color and design options. This is a feature that does not exist in natural stones such as marble and granite.

kayastone products can be produced thinner as they have higher strength than other cement-based terrazzos. In this way, there is a significant reduction in transportation costs. Lorem ipsum dolor, sit amet consectetur adipisicing elite.

kayastone products can be used as a table or kitchen counter by being coated with impregnation.

It is suitable for indoor and outdoor use.

Technical Information

Quality Certifications

Outdoor Floor Application & Grouting Suggestions

  • Application
    Before production, the existing surface floor will be swept and washed with pressure washing machines then a minimum of 3cm thick leveling process will be made.(1m³ washed and screened sand + 500kg cement + 0,290m³ water) This leveling layer will be cleaned after production made. Terrazzo tiles should not go under +5º C for 48 hours after the application made.
  • Grouting Paste
    In the mortar process, materials will be TS EN 197-1 Portland Cement, TS 706 EN 12620/ AC, TS2717 EN 13139 washed and screened natural sand, TS 266 clean and purified from hazardous element water mix. Then prepared mix will be mixed in a vertical concrete mixer. the resulting lightly moistured mix(300-350 dose) will paste on a predefined surface minimum of 2,5cm maximum 4cm.(corrections will be made with a trowel) In this process the mixture of cement-water will be poured over the surface and adjusted with a trowel.
  • Assembly
    Stairs will be placed with rubber mallets, over the floor mortar, giving at 2mm slope at most from nose corner. If 2 stairs will be placed adjacent 3mm suture will be used respect to slope and level. The installed stair surface will be cleaned with wet fabrics and suitable brushes from cement residues. With weather conditions suitability installed products should be wet and covered with membrane for 4 days to be cured.
  • Grouting
    After installation to get moisture away wait for 2 to 4 days (dependent on the weather conditions). Stairs intersection between riser and trouts gap will be filled with the compatible color of grout. After process residue of grout should be cleaned immediately. Floors with grouting process done should be covered with membrane and protected until delivery. After installment successfully completed and necessary waiting process done stair surfaces should be cleaned with soft soap and water.

Grouting Suggestions for Indoor Polished Surface Applications

  • Application
    Before production, the existing surface floor will be swept and washed with pressure washing machines then a minimum of 3cm thick leveling process will be made.(1m³ washed and screened sand + 500kg cement + 0,290m³ water) This leveling layer will be cleaned after production made. Terrazzo tiles should not go under +5º C for 48 hours after the application made.
  • Grouting Paste
    In the mortar process, materials will be TS EN 197-1 Portland Cement, TS 706 EN 12620/ AC, TS2717 EN 13139 washed and screened natural sand, TS 266 clean and purified from hazardous element water mix. Then prepared mix will be mixed in a vertical concrete mixer. the resulting lightly moistured mix(300-350 dose) will paste on a predefined surface minimum of 2,5cm maximum 4cm.(corrections will be made with a trowel) In this process the mixture of cement-water will be poured over the surface and adjusted with a trowel.
  • Assembly
    Stairs will be placed with rubber mallets, over the floor mortar, giving at 2mm slope at most from nose corner. If 2 stairs will be placed adjacent 3mm suture will be used respect to slope and level. The installed stair surface will be cleaned with wet fabrics and suitable brushes from cement residues. With weather conditions suitability installed products should be wet and covered with membrane for 4 days to be cured.
  • Grouting
    After installation to get moisture away wait for 2 to 4 days (dependent on the weather conditions). Stairs intersection between riser and trouts gap will be filled with the compatible color of grout. After process residue of grout should be cleaned immediately. Floors with grouting process done should be covered with membrane and protected until delivery. After installment successfully completed and necessary waiting process done stair surfaces should be cleaned with soft soap and water.

L Stairs

  • Application
    Before production, the existing surface floor will be swept and washed with pressure washing machines then a minimum of 3cm thick leveling process will be made.(1m³ washed and screened sand + 500kg cement + 0,290m³ water) This leveling layer will be cleaned after production made. Terrazzo tiles should not go under +5º C for 48 hours after the application made.
  • Grouting Paste
    In the mortar process, materials will be TS EN 197-1 Portland Cement, TS 706 EN 12620/ AC, TS2717 EN 13139 washed and screened natural sand, TS 266 clean and purified from hazardous element water mix. Then prepared mix will be mixed in a vertical concrete mixer. the resulting lightly moistured mix(300-350 dose) will paste on a predefined surface minimum of 2,5cm maximum 4cm.(corrections will be made with a trowel) In this process the mixture of cement-water will be poured over the surface and adjusted with a trowel.
  • Assembly
    Stairs will be placed with rubber mallets, over the floor mortar, giving at 2mm slope at most from nose corner. If 2 stairs will be placed adjacent 3mm suture will be used respect to slope and level. The installed stair surface will be cleaned with wet fabrics and suitable brushes from cement residues. With weather conditions suitability installed products should be wet and covered with membrane for 4 days to be cured.
  • Grouting
    After installation to get moisture away wait for 2 to 4 days (dependent on the weather conditions). Stairs intersection between riser and trouts gap will be filled with the compatible color of grout. After process residue of grout should be cleaned immediately. Floors with grouting process done should be covered with membrane and protected until delivery. After installment successfully completed and necessary waiting process done stair surfaces should be cleaned with soft soap and water.